Close Menu
    Recent Posts
    • Stakeholders Seeks Legislative Reforms To Drive Growth
    • NiMet Inaugurates Anti-Corruption and Transparency Unit
    • NiMet, AIM For Scale Partners To Deliver AI-Powered Weather Forecasts To Nigerian Farmers
    • Court Throws Out Defendant’s Document In Alleged $35m NCDMB Fraud Case
    • Alleged Theft of 25,354,000 Litres of PMS: EFCC Presents Second Witness Against Vessel MT Ostria, Captain, Others
    Facebook X (Twitter) Instagram
    Trending
    • Stakeholders Seeks Legislative Reforms To Drive Growth
    • NiMet Inaugurates Anti-Corruption and Transparency Unit
    • NiMet, AIM For Scale Partners To Deliver AI-Powered Weather Forecasts To Nigerian Farmers
    • Court Throws Out Defendant’s Document In Alleged $35m NCDMB Fraud Case
    • Alleged Theft of 25,354,000 Litres of PMS: EFCC Presents Second Witness Against Vessel MT Ostria, Captain, Others
    • Ex-NYSC DG, General Olawumi Says Scheme Relevant To National Integration, Devt
    • NYSC, Nigeria Police Strengthen Ties For Security Of Corps Members Nationwide
    • EFCC Warns Banks Against Granting Loans Without Credible Collateral
    Facebook X (Twitter) Instagram YouTube
    HumsimediaHumsimedia
    • Home
    • News
      • News Analysis
      • Politics
      • Environment
      • Energy
      • Security
      • Defence
    • Entertainment
    • Business
      • Economy
    • Health
    • Interview
    • Lifestyle
    • Global News
    HumsimediaHumsimedia
    Home » Report Maintenance Of Public Infrastructure To Relevant Departments- FEMD
    News

    Report Maintenance Of Public Infrastructure To Relevant Departments- FEMD

    HumsiBy HumsiDecember 26, 2024No Comments2 Mins Read
    Share
    Facebook Twitter LinkedIn Pinterest Email

    By Miriam Humbe

    The FCT Emergency Management Department, (FEMD) has advised residents to refer maintenance of public infrastructure to relevant agencies and departments.

    The Ag Director General of FEMD, Engr Abdulrahman Mohammed gave the advice after the rescue of three men trapped in a blocked manhole at Guzape in Asokoro District of the FCT on Christmas Day.

    Nkechi Isa, FEMD’s Head of Public Affairs disclosed this in a statement signed on Thursday, 26 December, 2024.

    The three men were rescued by a combined team of FEMD, FCT Fire service and NEMA.

    According to the FEMD Search and Rescue Team, two of the trapped men, who are labourers were engaged to clear debris that clogged the manhole leading to a central sewage system.

    A build up of trapped methane gas caused an explosion, resulting in both men being suffocated inside the manhole.

    A volunteer who attempted to rescue both men also became trapped.

    One of the rescued men is receiving treatment at the Wuse General Hospital, while two others are at the Asokoro District Hospital.

    Commending the emergency responders for averting what could have been a Christmas day tragedy, Engr Abdulrahman Mohammed appealed to residents to always use the 112 emergency toll free number in the event of an emergency.

    Dr Abdulrahman Mohammed FEMD Fire Service National Emergency Management Agency NEMA
    Share. Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Tumblr Email
    Humsi
    • Website

    Related Posts

    Stakeholders Seeks Legislative Reforms To Drive Growth

    April 17, 2026

    NiMet Inaugurates Anti-Corruption and Transparency Unit

    April 16, 2026

    NiMet, AIM For Scale Partners To Deliver AI-Powered Weather Forecasts To Nigerian Farmers

    April 16, 2026
    Leave A Reply Cancel Reply

    Facebook X (Twitter) Instagram Pinterest
    © 2026 Humsimedia. Designed by Humsi Media.

    Type above and press Enter to search. Press Esc to cancel.

    • three-benefits-social-behaviorprotection
    • difference-conflict-based-power-struggle-conflict-based
    • business-welland-owners-think-funding-recognized-brand
    • confronting-friend-anger-good-way-react
    • claire-wants-use-quote-famous-author-article-writing
    • parliament-invited-william-mary-take-english-throne
    • read-excerpt-dark-gameanother-thing-changed-little
    • one-reason-colony-new-netherland-grew-slowly
    • solve-system-substitution8x7y5xy
    • lock-opened-using-sequence-three-numbers-numbers-range-0
    • following-statements-correctlydescribes-relationship-gi
    • read-excerpt-politics-englishlanguage-george-orwellthere
    • word-excerpt-act-iiscene-iv-shakespeares-twelfth-night
    • definition-pullfactor
    • read-passage-animal-farmin-end-finished-harvest-two-days
    • read-excerpt-chapter-23-adventures-huckleberry-finnwhat
    • select-correct-answerwhy-someone-use-trusta-ensure
    • sentence-contains-example-foreshadowingi-known-day-turn
    • solve-x227where-x-real-numbersimplify-answer-much
    • read-excerpt-summary-events-srebrenicazina-hasanovic-one